Installation And Start-Up
3-29
Copyright
2001 Phone: (614) 771-2718 RE-4500
Vanner Inc. FAX: 614-771-4904 Owners Manual
4282 Reynolds Dr. www.vanner.com Rev 01e
Hilliard Ohio 43026 RE-Installation_Manual_Rev01e 910157-A
INCORPORATED
INCORPORATEDINCORPORATED
INCORPORATED
9.
Connect L1, N, L2 and ground to the appropriate terminals
in the terminal strip and torque each of the AC terminal
screws to 15 inch pounds. Re-torque after 30 days.
10.
Use the Chassis Ground compression fitting (28) to ground
the chassis using 10 gauge wire. Connect the chassis
ground wire to the compression fitting and torque the bolt
to 75 inch pounds. Re-torque after 30 days.
11.
Verify AC wiring installation. Verify that all connections
are tight. Secure all wiring and replace the AC Raceway
cover.